Just about completed my install of a set of PPE catted downpipes. The front DP was almost an inch too short from the rear flange the connects to the 3rd cat. All the hardware was loose and it wasn't hitting anything. I had to use a longer bolt to pull it up tight to the flange. Now there's no flex left in the flex pipe. Anyone else have this same situation? The rear DP was fine.